docs: mark WS-3a (Equipment live values) done; finalize task tracker

This commit is contained in:
Joseph Doherty
2026-06-07 06:08:36 -04:00
parent 2bfe18abcf
commit 2e4e100733
2 changed files with 20 additions and 10 deletions
@@ -1,6 +1,16 @@
# Scope: Equipment-Namespace Materialization in the Live Deploy Path
**Status:** Scoping (not yet a task plan)
> **STATUS UPDATE 2026-06-07 — WS-1/2/4 (structure) and WS-3a (VirtualTag live values) are DONE.**
> The structure milestone shipped on `master` (`febe462..9a67ebc`). **WS-3a — live values via VirtualTags**
> shipped on branch `feat/equipment-namespace-live-values` (plan:
> [`2026-06-07-equipment-namespace-live-values.md`](2026-06-07-equipment-namespace-live-values.md)).
> Verified live in docker-dev: galaxy mirror **396/396 Good**, and the company-shape Equipment namespace
> carries **live Good values** via VirtualTags — every company signal backed by a real galaxy source
> (396 of 1036; the other 640 cite synthetic refs the company UNS model invented beyond the 396 real
> galaxy attributes). Restart-safe (bootstrap restore re-serves Good, no re-deploy). WS-3b (OpcUaClient
> driver route) was **not** taken (the VirtualTag route was chosen). WS-5 (tests) done throughout.
**Status:** WS-1/2/4 + WS-3a DONE (2026-06-07); WS-3b not pursued
**Date:** 2026-06-06
**Author:** investigation while building the Northwind UNS overlay (see `scadaproj/otopcua-uns-loader/`)
**Depends on:** the driver value-streaming fixes already on `master` (`c1ce583`, `b1b3f3f`)