Files
ScadaBridge/docs/plans
Joseph Doherty f4707745bf docs(plans): completion roadmap for stillpending.md audit
Add the system-completion design doc (risk-first milestones M1-M10):
Phase 1 Stabilize (M1 runtime wiring, M2 correctness, M3 script trust
boundary, M4 doc reconciliation) then Phase 2 Expand (M5-M10 feature
epics). Scope = all Tier 1/2/4 + in-scope Tier 3 features; T12/T19
deferred to own brainstorm; deliberate anti-goals excluded. Also commit
the source audit (stillpending.md).
2026-06-15 09:27:00 -04:00
..