Files
ScadaBridge/docs/plans
Joseph Doherty 28bc639786 docs(plan): M2 implementation plan — Tier-2 correctness/behavioral gaps
19 tasks (M2.0-M2.19) covering stillpending.md Tier-2 items #7,#8,#9,#10,
#13,#17,#18,#20-#31, plus pre-existing EF model/snapshot drift (#32, lead item).
Risk-first ordering; migration tasks serialized. Scope decisions recorded:
#19 done in M1.8; #16 deferred to M8; #17 reverts Host-008 per design doc;
#8 filter semantics defined; #15 LDAP re-query spike-gated.
2026-06-15 13:08:37 -04:00
..