c3b4068de2
After a successful Live run whose graph has Pending outbound steps the page re-reads the tree through the existing Replay command every 5 s for up to 2 min (page constants), merging by replacing the graph and keeping the selection by event id; never in Replay mode; cancelled by a new run, a mode switch or Dispose. Status strip gains a Pending count, a 'Refresh outcomes' button (both modes) and an 'outcomes still arriving' note while polling. The run's own timing and the Completed chip are left alone — pending outbound work is not a failed run. Plan 2026-09-06 D5. Claude-Session: https://claude.ai/code/session_01NcMG6xXdsJbmD2wYAgkK29