Joseph Doherty bec07378cc test(deployment): de-flake unreachable-site reconcile breaker test; assert structurally, not by 2 s wall clock (ScadaBridge#92)
Under a loaded full-project run the serial prepare of 6 instances with a 300 ms
reconcile deadline took 2.6 s and tripped the fixed 2 s cap (5/10 full runs
failed under CPU load). Deadline raised to 2 s so it cannot expire before the
query is sent; the elapsed bound is now derived from the deadline (must beat
(n-1) deadlines) while the one-query assertion proves the breaker.

Claude-Session: https://claude.ai/code/session_01GT67AEHd2Acv1YPwGfXEoV