Files
ScadaBridge/docs/plans/phase-8-checklist.md
T
Joseph Doherty 2b80a6defa test(perf): measure phase-8 WP-4 residual criteria xc-3/4/5/8 (#49)
New ResidualBench tool (eventlog, flatten, audit, audit-contention) and
docker/measure-ui-responsiveness.sh. All four residuals pass; results in
docs/plans/2026-11-10-wp4-residual-scope-results.md. Findings filed as
#122, #123 and #124 (fixed in the following commit).
2026-11-10 16:46:42 -05:00

2.6 KiB
Raw Blame History

Phase 8 Execution Checklist

Update 2026-08-07 (truth sweep): This checklist previously read "Status: Complete / Tests: All passing / Build: 0 errors, 0 warnings" — a 107-byte stub with no per-work-package results and no linked run. That claim was unevidenced and was retired.

Update 2026-08-15 (WP-4 run, evidenced): The target-scale load test has now actually been run, at full scale, with results published.

WP-4 — Load/Performance Testing at Target Scale

Status: measured 2026-08-15. Not a claim — a run.

  • Scale executed: 10 sites × 500 instances × 75 tags = 375,000 live tag subscriptions, 37,518 tag updates/second achieved against 37,500 nominal (100.0%), 45,021,375 updates offered over a 20-minute steady-state window.
  • Headline results: end-to-end tag update latency P50 0.88 ms / P99 4.57 ms / max 37.41 ms; zero events dropped at 100 live stream subscribers; health report collect+ingest P99 0.31 ms with 10/10 sites tracked centrally; debug view snapshot under load P99 2.19 ms with 0 timeouts; 500 instances deployed to a site in 2.6 s; CPU 2.9% of the box; working-set slope +8.83 MB/min.
  • 11 clean passes, 1 pass with a documented caveat, 0 failures.
  • Deferred-work register #25 and row 50 are closed by this run.

Results: 2026-08-15-target-scale-load-test-results.md — per-criterion numbers vs thresholds, three findings (F1 memory-window limitation, F2 the S&F retry-interval wait, F3 slow-subscriber isolation), and an explicit "what this does not prove" section.

Design, thresholds and deviations: 2026-08-15-target-scale-load-test-design.md — including the documented deviation from the protocol's 1-hour sustained window to 20 minutes, and the command for the full 1-hour version.

Harness: tests/ZB.MOM.WW.ScadaBridge.LoadHarness/ (standalone executable), with a CI-scale smoke [Fact] at tests/ZB.MOM.WW.ScadaBridge.PerformanceTests/TargetScale/TargetScaleHarnessSmokeTests.cs so the evidence can be regenerated rather than bit-rotting.

Still open within WP-4 (not covered by this harness — central-cluster and browser concerns): [xc-3] site event logging volume within 30-day/1 GB limits, [xc-4] audit logging not degrading central, [xc-5] template flattening/validation for large templates, [xc-8] UI workflow responsiveness. Covered 2026-11-10 (#49): all four measured and passed — results docs/plans/2026-11-10-wp4-residual-scope-results.md (follow-ups #122, #123, #124).

See phase-8-production-readiness.md:152-170 (WP-4) and :314-320 (test protocol) for the original scope.