Commit Graph

4 Commits

Author SHA1 Message Date
Joseph Doherty 43228185b4 docs: convert standard diagrams from draw.io PNGs to inline Mermaid
Gitea renders mermaid inline, so the flow/state/hierarchy/DAG diagrams
move to text-in-markdown: auto-layout (removes the manual overlap-prone
draw.io step), diffable source, no committed binaries, and a dark-text
theme so labels stay legible. Keep draw.io PNGs only for the two complex
bespoke diagrams (logical architecture, env2 topology) where pixel
control still wins. All 24 mermaid blocks validated by rendering.
2026-06-01 00:23:00 -04:00
Joseph Doherty bdee12f4e9 docs: render architecture & flow diagrams as draw.io charts
Replace ASCII-art diagrams across the README and docs/ with editable
.drawio sources plus exported PNGs, so the diagrams render clearly in
rendered markdown and can be maintained/regenerated instead of being
hand-edited as fragile text art. Non-diagram blocks (code, folder
trees, UI wireframes) were left as text.
2026-05-31 23:32:53 -04:00
Joseph Doherty 7b0b9c7365 refactor: rename ScadaLink → ZB.MOM.WW.ScadaBridge (code + projects + namespaces)
Solution + 23 src projects + 26 test projects renamed; folders, csproj,
namespaces, and ScadaLinkDbContext/ScadaBridgeDbContext class updated.
ActorSystem "scadalink" → "scadabridge", Akka seed-node URLs migrated.
SQL roles/logins, LDAP domains, CLI command name, and CLI config dir
(~/.scadalink → ~/.scadabridge) also renamed.

Build green; 5 Host.Tests fail awaiting SQL login rename in next commit.
Pre-existing StaleTagMonitor timing flakes unchanged.

Rename script committed at tools/rename-to-scadabridge.sh.
2026-05-28 09:37:45 -04:00
Joseph Doherty b659978764 Phase 8: Production readiness — failover tests, security hardening, sandboxing, deployment docs
- WP-1-3: Central/site failover + dual-node recovery tests (17 tests)
- WP-4: Performance testing framework for target scale (7 tests)
- WP-5: Security hardening (LDAPS, JWT key length, no secrets in logs) (11 tests)
- WP-6: Script sandboxing adversarial tests (28 tests, all forbidden APIs)
- WP-7: Recovery drill test scaffolds (5 tests)
- WP-8: Observability validation (structured logs, correlation IDs, metrics) (6 tests)
- WP-9: Message contract compatibility (forward/backward compat) (18 tests)
- WP-10: Deployment packaging (installation guide, production checklist, topology)
- WP-11: Operational runbooks (failover, troubleshooting, maintenance)
92 new tests, all passing. Zero warnings.
2026-03-16 22:12:31 -04:00