Joseph Doherty d1ade5653b docs(plans): bookkeeping sync — reconcile stale trackers with merged code
A verified audit of all ~90 plan documents (2026-08-01) found ~30 .tasks.json
trackers and several plan headers still reporting 'pending'/'draft' for work
fully merged to main. Sync them so future audits don't re-litigate closed work:

- Flip ~380 stale task statuses to completed across March/May/June/July
  trackers (audit-log series, milestones M5-M10, playwright waves, stillpending,
  LocalDb, ClusterClient->gRPC DoD rows, and more), each verified against
  code/git evidence before flipping.
- Annotate obsolete-not-done rows: ClusterClient CLI transport (never built,
  HTTP shipped), TreeView Areas/Instances pages (replaced by Topology),
  template-tree drag-drop (dropped for M9 menu reorder), otopcua item C
  (premise superseded by #17).
- Flip stale headers: aggregated-live-alarm + kpi-rollups 'Draft not executed'
  -> Delivered 2026-07-10; otopcua cutover-scope SCOPING -> DECIDED;
  scadabridge-rename -> Implemented; LocalDb phase1/2 status strings ->
  merged 28ca04d7.
- Fix doc drift: T9/T10 'deferred' -> shipped as SMS (Teams dropped); waitfor
  sandbox follow-up shipped; followups #52/#53/#54/#162/#207 resolved; purge
  TODO closed by PendingDeploymentPurgeActor; live-gate pre-existing failures
  #28/#29/#31 fixed; auto-down boot-alone residual superseded by self-first
  seeds; supersession banners on keep-oldest SBR + ClusterClient-era designs;
  requirements-traceability 'Pending' clarified as frozen plan-generation
  status.

Deliberately left pending (genuinely open, tracked in the pending-work list):
opcua-tag-browser task 19 (live smoke), ipsen tasks 7-8 (vd03 verification),
selfform task 7 (vd03 overlay, user-held), live-gate observation 1
(external-system delete orphan bug), otopcua item A + maxDepth calibration.
2026-08-01 08:53:56 -04:00
Joseph Doherty 7044791a55 docs(plans): scrub LmxProxy references from design plans
Remove the LmxProxy work package (WP-8) from phase-3b, the CD-DCL-1..6
protocol details, Q9/Q-P3B-2 from the questions log, the LmxProxy
component-design rows in requirements-traceability, and the inline
mentions across phase-0, phase-4, the gRPC streaming plans, and the
primary/backup data-connection plans.
2026-05-13 13:30:07 -04:00
Joseph Doherty d91aa83665 refactor(docs): move requirements and test infra docs into docs/ subdirectories
Organize documentation by moving requirements (HighLevelReqs, Component-*,
lmxproxy_protocol) to docs/requirements/ and test infrastructure docs to
docs/test_infra/. Updates all cross-references in README, CLAUDE.md,
infra/README, component docs, and 23 plan files.
2026-03-21 01:11:35 -04:00
Joseph Doherty 8c2091dc0a Phase 0 WP-0.10–0.12: Host skeleton, options classes, sample configs, and execution framework
- WP-0.10: Role-based Host startup (Central=WebApplication, Site=generic Host),
  15 component AddXxx() extension methods, MapCentralUI/MapInboundAPI stubs
- WP-0.11: 12 per-component options classes with config binding
- WP-0.12: Sample appsettings for central and site topologies
- Add execution procedure and checklist template to generate_plans.md
- Add phase-0-checklist.md for execution tracking
- Resolve all 21 open questions from plan generation
- Update IDataConnection with batch ops and IAsyncDisposable
57 tests pass, zero warnings.
2026-03-16 18:59:07 -04:00
Joseph Doherty 021817930b Generate all 11 phase implementation plans with bullet-level requirement traceability
All phases (0-8) now have detailed implementation plans with:
- Bullet-level requirement extraction from HighLevelReqs sections
- Design constraint traceability (KDD + Component Design)
- Work packages with acceptance criteria mapped to every requirement
- Split-section ownership verified across phases
- Orphan checks (forward, reverse, negative) all passing
- Codex MCP (gpt-5.4) external verification completed per phase

Total: 7,549 lines across 11 plan documents, ~160 work packages,
~400 requirements traced, ~25 open questions logged for follow-up.
2026-03-16 15:34:54 -04:00
Joseph Doherty a9fa74d5ac Document LmxProxy protocol in DCL, strengthen plan generation traceability guards, and add UI constraints
- Replace "custom protocol" placeholder with full LmxProxy details (gRPC transport, SDK API mapping, session management, keep-alive, TLS, batch ops)
- Add bullet-level requirement traceability, design constraint traceability (52 KDD + 6 CD), split-section tracking, and post-generation orphan check to plan framework
- Resolve Q9 (LmxProxy), Q11 (REST test server), Q13 (solo dev), Q14 (self-test), Q15 (Machine Data DB out of scope)
- Set Central UI constraints: Blazor Server + Bootstrap only, no heavy frameworks, custom components, clean corporate design
2026-03-16 15:08:57 -04:00
Joseph Doherty 652378b470 Add test infrastructure with Docker services, CLI tools, and resolve Phase 0 questions
Stand up local dev infrastructure (OPC UA, LDAP, MS SQL) with Docker Compose,
Python CLI tools for service interaction, and teardown script. Fix GLAuth config
mount, OPC PLC node format, and document actual DN/namespace behavior discovered
during testing. Resolve Q1-Q8,Q10: .NET 10, Akka.NET 1.5.x, monorepo with slnx,
appsettings JWT, Windows Server 2022 site target.
2026-03-16 14:03:12 -04:00
Joseph Doherty 7a0bd0f701 Create implementation plan generation framework
generate_plans.md: Master plan defining 10 phases (0, 1, 2, 3A, 3B, 3C, 4-8)
with component assignments, sub-tasks, testable outcomes, and HighLevelReqs
coverage. Phase 3 split into 3A (runtime foundation + failover), 3B (site I/O
+ observability), 3C (deployment pipeline + S&F) per Codex review. Failover
testing embedded in runtime phases, not deferred to hardening.

requirements-traceability.md: Full matrix mapping all 54 HighLevelReqs sections
and 22 REQ-* identifiers to implementation phases. Zero unmapped requirements.

questions.md: 15 open questions requiring follow-up before/during implementation
(tooling, environments, team, integration targets).
2026-03-16 09:59:23 -04:00