Joseph Doherty 9b0cf44c02 docs(archreview): sync Status Board — PLAN-05 Complete/merged (ec23db35), PLAN-04 merge confirmed; initiative 128/192
Claude-Session: https://claude.ai/code/session_01MtdgwpEeCUn6cUA5f1LMPj
2026-07-10 03:38:07 -04:00
Joseph Doherty dbd3ed2fc7 docs(archreview): sync PLAN-04 tasks.json + tracker — Task 26 sweep GREEN, plan COMPLETE (26/26)
Full-solution build 0 warn/0 err; all 30 unit+integration test assemblies pass
after fixing one stale enum-count lock-in test (22d52390). Playwright E2E residue
is environmental (stale docker cluster, SQLite-open on site-container deploy;
non-deterministic set; zero PLAN-04 file overlap). Initiative total 104/192.

Claude-Session: https://claude.ai/code/session_01MtdgwpEeCUn6cUA5f1LMPj
2026-07-09 14:59:20 -04:00
Joseph Doherty a9da1ed804 docs(archreview): sync PLAN-04 tasks.json + tracker — Task 24 completed (25/26, only T26 sweep remains) 2026-07-09 10:05:24 -04:00
Joseph Doherty 3a21e77c03 docs(archreview): add cross-plan parallelization map for incomplete tasks + sync stale PLAN-04 status
Corrects the Status Board (PLAN-04 24/26, not 0), and adds a Parallelization Map to
00-MASTER-TRACKER plus a per-plan Parallelization block to PLAN-04/05/06/07/08. Derives
ready sets from the live .tasks.json blockedBy graphs and the Files metadata, identifies
the initiative-wide serialization mutexes (ManagementActor.cs single-writer, EF migration
snapshot, Host/Program.cs, ArtifactDeploymentService.cs, SiteStorageService.cs,
NotificationOutboxActor.cs, AlarmSummary.razor), and recommends the safe concurrent
subagent lanes per plan. Flags PLAN-07 T33 as a dedupe-skip (CLI.Tests already in slnx).
2026-07-09 09:53:05 -04:00
Joseph Doherty 1586e791f7 docs(archreview): sync stale Status Board — PLAN-01 & PLAN-03 now Complete/merged (78/192)
The Status Board still showed PLAN-01 as 'branch not yet merged' and PLAN-03
as 'In progress, 0 done'; both are 100% complete and on main (PLAN-01
ec47cb56, PLAN-03 c7a0c922). Update the two rows, correct the stale
'NOT yet merged' PLAN-01 narrative, and add a PLAN-03 completion line with
the corrected initiative total (78 of 192).
2026-07-09 06:00:37 -04:00
Joseph Doherty 9049690bdb fix(centralui-tests): register stub IBrowseService in SecuredWritesTests harness (PLAN-07 known-issue resolved)
The Secured Writes page embeds NodeBrowserDialog (@inject IBrowseService) for
the OPC UA tag picker; bUnit resolves the injected service at render time, so
three SecuredWritesTests failed with 'no registered service of type
IBrowseService'. Register a Substitute.For<IBrowseService>() singleton in the
fixture (mirrors NodeBrowserDialogSearchTests). Suite now 7/7 green.

Marks the PLAN-07 'Post-plan known issues' entry and the 00-MASTER-TRACKER
registry cross-reference RESOLVED.
2026-07-09 05:55:53 -04:00
Joseph Doherty 765ff131d8 docs(archreview): log SecuredWrites IBrowseService bUnit-harness failures against PLAN-07 (pre-existing, surfaced during PLAN-03 full-suite run) 2026-07-09 05:46:29 -04:00
Joseph Doherty ef69fab6f6 docs(archreview): register PLAN-03 Task 15 readiness-handshake deviation as a follow-up (owner: Task 26 doc capture) 2026-07-09 00:36:20 -04:00
Joseph Doherty 5d5c747517 docs(archreview): mark PLAN-02 complete (24/24, merged) in master tracker 2026-07-08 23:11:52 -04:00
Joseph Doherty ec47cb5612 docs(archreview): PLAN-01 complete (23/23) — sync tracker + tasks.json; log deploy-artifact deferral 2026-07-08 17:12:46 -04:00
Joseph Doherty 15d91d760f docs(archreview): sync PLAN-01 tracker + tasks.json — Wave 1 T2,T5–T12 done (12/23) 2026-07-08 16:14:46 -04:00
Joseph Doherty 6b5c70dd19 docs(archreview): reconcile master tracker + tasks.json with P0 completion (10 tasks done) and SBR follow-up 2026-07-08 15:37:41 -04:00
Joseph Doherty 3f8e18c6f7 docs(archreview): mark all six P0 items delivered in the master tracker 2026-07-08 15:18:55 -04:00
Joseph Doherty 6ff90702f0 docs(archreview): register active-node-crash SBR gap found during P0 (keep-oldest 2-node limitation) 2026-07-08 15:11:03 -04:00
Joseph Doherty c0c89a4954 docs(archreview): add architecture-review fix plans (P0 initiative baseline) 2026-07-08 14:43:07 -04:00