Joseph Doherty d1ade5653b docs(plans): bookkeeping sync — reconcile stale trackers with merged code
A verified audit of all ~90 plan documents (2026-08-01) found ~30 .tasks.json
trackers and several plan headers still reporting 'pending'/'draft' for work
fully merged to main. Sync them so future audits don't re-litigate closed work:

- Flip ~380 stale task statuses to completed across March/May/June/July
  trackers (audit-log series, milestones M5-M10, playwright waves, stillpending,
  LocalDb, ClusterClient->gRPC DoD rows, and more), each verified against
  code/git evidence before flipping.
- Annotate obsolete-not-done rows: ClusterClient CLI transport (never built,
  HTTP shipped), TreeView Areas/Instances pages (replaced by Topology),
  template-tree drag-drop (dropped for M9 menu reorder), otopcua item C
  (premise superseded by #17).
- Flip stale headers: aggregated-live-alarm + kpi-rollups 'Draft not executed'
  -> Delivered 2026-07-10; otopcua cutover-scope SCOPING -> DECIDED;
  scadabridge-rename -> Implemented; LocalDb phase1/2 status strings ->
  merged 28ca04d7.
- Fix doc drift: T9/T10 'deferred' -> shipped as SMS (Teams dropped); waitfor
  sandbox follow-up shipped; followups #52/#53/#54/#162/#207 resolved; purge
  TODO closed by PendingDeploymentPurgeActor; live-gate pre-existing failures
  #28/#29/#31 fixed; auto-down boot-alone residual superseded by self-first
  seeds; supersession banners on keep-oldest SBR + ClusterClient-era designs;
  requirements-traceability 'Pending' clarified as frozen plan-generation
  status.

Deliberately left pending (genuinely open, tracked in the pending-work list):
opcua-tag-browser task 19 (live smoke), ipsen tasks 7-8 (vd03 verification),
selfform task 7 (vd03 overlay, user-held), live-gate observation 1
(external-system delete orphan bug), otopcua item A + maxDepth calibration.
2026-08-01 08:53:56 -04:00
Joseph Doherty 7b0b9c7365 refactor: rename ScadaLink → ZB.MOM.WW.ScadaBridge (code + projects + namespaces)
Solution + 23 src projects + 26 test projects renamed; folders, csproj,
namespaces, and ScadaLinkDbContext/ScadaBridgeDbContext class updated.
ActorSystem "scadalink" → "scadabridge", Akka seed-node URLs migrated.
SQL roles/logins, LDAP domains, CLI command name, and CLI config dir
(~/.scadalink → ~/.scadabridge) also renamed.

Build green; 5 Host.Tests fail awaiting SQL login rename in next commit.
Pre-existing StaleTagMonitor timing flakes unchanged.

Rename script committed at tools/rename-to-scadabridge.sh.
2026-05-28 09:37:45 -04:00
Joseph Doherty 552c9e4065 docs(templates): record phase 4-9 completion + verification TODOs
All nine derive-on-compose phases are now implemented. The status doc
captures what shipped per phase, what was deferred (LockedInDerived
override warning toast, SCADA008 base-Parent hint), and the live-DB /
UI smoke checks worth running before merge.
2026-05-12 08:59:19 -04:00
Joseph Doherty 8b8b85c839 docs(templates): record phase 2+3 completion in status doc
Phase 1 → 3 marked done; remaining work is phases 4-9. Sanity script now
targets the post-Phase-3 commit (03a8c4a) and notes the pre-existing
NU1608 build error in IntegrationTests / Host.Tests so future sessions
don't chase a phantom regression.
2026-05-12 08:31:20 -04:00
Joseph Doherty 91b786eb1c docs(templates): derive-on-compose phase status + resume plan
Companion to the design doc — captures current state, the four
decisions already made, what's done (phase 1, commit 5615f3d),
and a full play-by-play for phases 2 through 9 with exact files,
methods, and tests to touch. Written so a future session after
context compaction can pick up cleanly.
2026-05-12 08:18:43 -04:00