Joseph Doherty 9ee402bbcd Resolve all 46 low-severity architecture review findings 2026-09-09 22:56:36 -04:00
Joseph Doherty 9a87d7a328 Resolve all 33 medium-severity architecture review findings
Second slice of the 2026-09-09 whole-system review remediation
(docs/plans/2026-09-09-arch-review.md §10), on top of the High slice 146a1323.

Runtime/devices: SR-2 alarm on-trigger integration scope; SR-3 correlated NativeAlarmActor
subscribe retry; SR-4 immutable audited DB target; SR-5 ordered InstanceActor stop/flush;
SR-12 rehydration fence; SR-13 S&F gate recheck per delivery; DC-4 no OPC UA security
downgrade; DC-5 alarm snapshot for every new subscriber; ORCH-1 sync-dispose joins the pump.

Management/UI: MG-2 site scope on audit tree + Flow Debugger Replay; MG-3 stale-probe memo
removed; MG-4 server-owned bulk-deploy deadline; UI-5 sandbox runs in a killable child
process (new CentralUI.SandboxWorker project); UI-14 bounded sandbox output/IPC.

Edge/audit: EI-1 relay audit ownership; EI-2 SkipBodyCapture suppresses error text; EI-3/EI-11
error-field redaction + caps; EI-4 single relay deadline, pre-execution-only retry; EI-5
authenticated relay provenance; EI-10 body cap before audit read.

Persistence/contracts: DL-1 global Instance.UniqueName unique index + conflict translation;
DL-2 DataConnection protocol config encrypted at rest (migration
20260909203046_EnforceGlobalInstanceNamesAndProtectProtocolConfiguration — coordinated
central upgrade, old binaries cannot read protected rows); DL-3 bounded Replay paging;
DL-6 cross-site Overwrite of a deployed instance rejected; XC-4 proto descriptor contract test.

Config/hygiene: XC-1 central listener isolation by local port; XC-2/XC-3 inert SMTP + cron
keys removed from rig settings; CM-2 env2 bootstrap guard enabled; DC-6 deploy site exit code;
DC-7 notifier retries only explicit standby rejection; XC-5 ClusterClient purged from docs.

Gates recorded in the report: build 0/0, 9 397 passed / 0 failed, rig redeployed on all
eight nodes with the migration applied. 46 Low findings remain open.
2026-09-09 22:05:30 -04:00
Joseph Doherty 146a13238f Resolve all high-severity architecture review findings 2026-09-09 16:13:58 -04:00
Joseph Doherty 8bfe65512e docs: update architecture review with independent findings and verification 2026-09-09 15:06:28 -04:00
Joseph Doherty c078bc8fd4 docs: whole-system architectural/code review 2026-09-09 (83 findings, 8 High; 9-WP remediation program)
Eight parallel area reviewers + orchestrator verification at main @ d8229916.
All 12 CLAUDE.md design commitments hold. Highs: DC-1 no unsubscribe ever sent,
DC-2 redundant Mx handle release freezes live tag, DC-3 device writes stashed
across reconnect, SR-1 sync Attributes[] blocks script pool, CM-1 no gRPC
message-size limit, MG-1 trust deny-list gap (CompilerServices/Loader), UI-1 UI
config edits bypass IAuditService, UI-2 session ping defeats idle timeout.
Suite: build 0/0, 9231 passed / 1 failed (ORCH-1 OperationTrackingStore
sync-dispose race). No code changed by this review.