Joseph Doherty
|
4df3a55824
|
docs: truth sweep — retire stale registers, reconcile ledgers with shipped state
- deferred.md: DELETED (git rm) — stale 2026-07-10 duplicate of the canonical
deferred-work register; this completes archreview R2-08 T11 (the file was
tracked, not untracked as the task assumed)
- ScadaBridge-docs-issues.md, ScadaBridge-docs-fixed.md: DELETED (git rm) —
generated 2026-07-10 CommentChecker reports, already consumed; completes
R2-08 T13 (also tracked, not untracked)
- stillpending.md: prepended historical-snapshot banner (2026-06-15 audit;
Tier-1 table is not current open work)
- docs/plans/phase-8-checklist.md: replaced the unevidenced 'Complete / All
passing' stub with the honest state per register row 25 (WP-4 target-scale
load test never run)
- archreview/plans/00-MASTER-TRACKER.md: R2-01 T2 live failover drill
annotated RESOLVED 2026-08-01 (PLAN-R2-01 T4 + docker/failover-drill.sh +
SbrFailoverTests); R2-08 T11/T13 recorded completed by this sweep
- docs/plans/2026-07-22-clusterclient-to-grpc-plan.md: P3 deferred-RPCs note
updated (all four live-proven 2026-08-01, 1c99d6fa); ClusterClientSiteAuditClient
naming follow-up marked DONE (63c16d69)
- docs/plans/2026-05-28-opcua-tag-browser.md.tasks.json: Task 19 flipped to
completed (manual smoke PASS 2026-08-01, 6dc5d94c)
- archreview/plans/PLAN-R2-0[1-8]*.tasks.json: all-pending manifests reconciled
with the authoritative tracker (round 2 merged @ 1930f19b) — flipped to
completed except R2-08 T1/T2 which remain pending needs-user
- docs/operations/2026-07-16-secrets-clustered-master-key.md: correction banner
(SQL-hub replication shipped 8e12f994; KEK-rotation + clustered-secrets
runbooks ship with ZB.MOM.WW.Secrets)
- docs/plans/2026-07-19-localdb-phase2-live-gate.md: external-system-delete
observation annotated RESOLVED (2d03f2d5 reconciles deletions incl.
external_systems)
Claude-Session: https://claude.ai/code/session_014WNM4vjoVksyyBraTXSZE1
|
2026-08-07 01:56:33 -04:00 |
|
Joseph Doherty
|
2b2cc0a151
|
All phases complete: execution checklists for Phases 3C through 8
All 11 phases (0, 1, 2, 3A, 3B, 3C, 4, 5, 6, 7, 8) implemented.
781 tests passing across 20 test projects. Zero build warnings.
|
2026-03-16 22:19:29 -04:00 |
|