docs(plans): bookkeeping sync — reconcile stale trackers with merged code
A verified audit of all ~90 plan documents (2026-08-01) found ~30 .tasks.json
trackers and several plan headers still reporting 'pending'/'draft' for work
fully merged to main. Sync them so future audits don't re-litigate closed work:
- Flip ~380 stale task statuses to completed across March/May/June/July
trackers (audit-log series, milestones M5-M10, playwright waves, stillpending,
LocalDb, ClusterClient->gRPC DoD rows, and more), each verified against
code/git evidence before flipping.
- Annotate obsolete-not-done rows: ClusterClient CLI transport (never built,
HTTP shipped), TreeView Areas/Instances pages (replaced by Topology),
template-tree drag-drop (dropped for M9 menu reorder), otopcua item C
(premise superseded by #17).
- Flip stale headers: aggregated-live-alarm + kpi-rollups 'Draft not executed'
-> Delivered 2026-07-10; otopcua cutover-scope SCOPING -> DECIDED;
scadabridge-rename -> Implemented; LocalDb phase1/2 status strings ->
merged 28ca04d7.
- Fix doc drift: T9/T10 'deferred' -> shipped as SMS (Teams dropped); waitfor
sandbox follow-up shipped; followups #52/#53/#54/#162/#207 resolved; purge
TODO closed by PendingDeploymentPurgeActor; live-gate pre-existing failures
#28/#29/#31 fixed; auto-down boot-alone residual superseded by self-first
seeds; supersession banners on keep-oldest SBR + ClusterClient-era designs;
requirements-traceability 'Pending' clarified as frozen plan-generation
status.
Deliberately left pending (genuinely open, tracked in the pending-work list):
opcua-tag-browser task 19 (live smoke), ipsen tasks 7-8 (vd03 verification),
selfform task 7 (vd03 overlay, user-held), live-gate observation 1
(external-system delete orphan bug), otopcua item A + maxDepth calibration.
This commit is contained in:
@@ -191,5 +191,5 @@
|
||||
}
|
||||
],
|
||||
"lastUpdated": "2026-07-19",
|
||||
"phase1Status": "COMPLETE - all 15 tasks done, live gate PASS. Branch feat/localdb-phase1 NOT merged/pushed."
|
||||