docs(plans): bookkeeping sync — reconcile stale trackers with merged code
A verified audit of all ~90 plan documents (2026-08-01) found ~30 .tasks.json
trackers and several plan headers still reporting 'pending'/'draft' for work
fully merged to main. Sync them so future audits don't re-litigate closed work:
- Flip ~380 stale task statuses to completed across March/May/June/July
trackers (audit-log series, milestones M5-M10, playwright waves, stillpending,
LocalDb, ClusterClient->gRPC DoD rows, and more), each verified against
code/git evidence before flipping.
- Annotate obsolete-not-done rows: ClusterClient CLI transport (never built,
HTTP shipped), TreeView Areas/Instances pages (replaced by Topology),
template-tree drag-drop (dropped for M9 menu reorder), otopcua item C
(premise superseded by #17).
- Flip stale headers: aggregated-live-alarm + kpi-rollups 'Draft not executed'
-> Delivered 2026-07-10; otopcua cutover-scope SCOPING -> DECIDED;
scadabridge-rename -> Implemented; LocalDb phase1/2 status strings ->
merged 28ca04d7.
- Fix doc drift: T9/T10 'deferred' -> shipped as SMS (Teams dropped); waitfor
sandbox follow-up shipped; followups #52/#53/#54/#162/#207 resolved; purge
TODO closed by PendingDeploymentPurgeActor; live-gate pre-existing failures
#28/#29/#31 fixed; auto-down boot-alone residual superseded by self-first
seeds; supersession banners on keep-oldest SBR + ClusterClient-era designs;
requirements-traceability 'Pending' clarified as frozen plan-generation
status.
Deliberately left pending (genuinely open, tracked in the pending-work list):
opcua-tag-browser task 19 (live smoke), ipsen tasks 7-8 (vd03 verification),
selfform task 7 (vd03 overlay, user-held), live-gate observation 1
(external-system delete orphan bug), otopcua item A + maxDepth calibration.
This commit is contained in:
@@ -239,7 +239,9 @@ fully cover the DELMIA/MES use case.
|
||||
> **Status:** IMPLEMENTED. `Route.To(code).WaitForAttribute(name, targetValue, timeout)` is wired
|
||||
> end-to-end (`RouteToWaitForAttributeRequest/Response` → `IInstanceRouter` → `CommunicationService`
|
||||
> → `SiteCommunicationActor` → `DeploymentManagerActor` → `InstanceActor`), value-equality only
|
||||
> across the wire. NOT wired into the CentralUI Test-Run sandbox — that remains a follow-up.
|
||||
> across the wire. ~~NOT wired into the CentralUI Test-Run sandbox — that remains a follow-up.~~
|
||||
> **Follow-up SHIPPED 2026-07-10** — the CentralUI Test-Run sandbox is wired via
|
||||
> `SandboxInstanceGateway`/`SandboxScriptHost` (deferred-work register row #14 resolved).
|
||||
|
||||
---
|
||||
|
||||
|
||||
Reference in New Issue
Block a user