Phase 8: Production readiness — failover tests, security hardening, sandboxing, deployment docs
- WP-1-3: Central/site failover + dual-node recovery tests (17 tests) - WP-4: Performance testing framework for target scale (7 tests) - WP-5: Security hardening (LDAPS, JWT key length, no secrets in logs) (11 tests) - WP-6: Script sandboxing adversarial tests (28 tests, all forbidden APIs) - WP-7: Recovery drill test scaffolds (5 tests) - WP-8: Observability validation (structured logs, correlation IDs, metrics) (6 tests) - WP-9: Message contract compatibility (forward/backward compat) (18 tests) - WP-10: Deployment packaging (installation guide, production checklist, topology) - WP-11: Operational runbooks (failover, troubleshooting, maintenance) 92 new tests, all passing. Zero warnings.
This commit is contained in:
@@ -1,6 +1,15 @@
|
||||
namespace ScadaLink.NotificationService;
|
||||
|
||||
/// <summary>
|
||||
/// Configuration options for the Notification Service.
|
||||
/// Most SMTP configuration is stored in the database (SmtpConfiguration entity).
|
||||
/// This provides fallback defaults and operational limits.
|
||||
/// </summary>
|
||||
public class NotificationOptions
|
||||
{
|
||||
// Phase 0: minimal POCO — most SMTP configuration is stored in the database
|
||||
/// <summary>Default connection timeout for SMTP connections.</summary>
|
||||
public int ConnectionTimeoutSeconds { get; set; } = 30;
|
||||
|
||||
/// <summary>Maximum concurrent SMTP connections.</summary>
|
||||
public int MaxConcurrentConnections { get; set; } = 5;
|
||||
}
|
||||
|
||||
Reference in New Issue
Block a user