Phase 8: Production readiness — failover tests, security hardening, sandboxing, deployment docs

- WP-1-3: Central/site failover + dual-node recovery tests (17 tests)
- WP-4: Performance testing framework for target scale (7 tests)
- WP-5: Security hardening (LDAPS, JWT key length, no secrets in logs) (11 tests)
- WP-6: Script sandboxing adversarial tests (28 tests, all forbidden APIs)
- WP-7: Recovery drill test scaffolds (5 tests)
- WP-8: Observability validation (structured logs, correlation IDs, metrics) (6 tests)
- WP-9: Message contract compatibility (forward/backward compat) (18 tests)
- WP-10: Deployment packaging (installation guide, production checklist, topology)
- WP-11: Operational runbooks (failover, troubleshooting, maintenance)
92 new tests, all passing. Zero warnings.
This commit is contained in:
Joseph Doherty
2026-03-16 22:12:31 -04:00
parent 3b2320bd35
commit b659978764
68 changed files with 6253 additions and 44 deletions
@@ -0,0 +1,12 @@
namespace ScadaLink.NotificationService;
/// <summary>
/// Abstraction over SMTP client for testability.
/// </summary>
public interface ISmtpClientWrapper
{
Task ConnectAsync(string host, int port, bool useTls, CancellationToken cancellationToken = default);
Task AuthenticateAsync(string authType, string? credentials, CancellationToken cancellationToken = default);
Task SendAsync(string from, IEnumerable<string> bccRecipients, string subject, string body, CancellationToken cancellationToken = default);
Task DisconnectAsync(CancellationToken cancellationToken = default);
}