Resolve all 33 medium-severity architecture review findings
Second slice of the 2026-09-09 whole-system review remediation
(docs/plans/2026-09-09-arch-review.md §10), on top of the High slice 146a1323.
Runtime/devices: SR-2 alarm on-trigger integration scope; SR-3 correlated NativeAlarmActor
subscribe retry; SR-4 immutable audited DB target; SR-5 ordered InstanceActor stop/flush;
SR-12 rehydration fence; SR-13 S&F gate recheck per delivery; DC-4 no OPC UA security
downgrade; DC-5 alarm snapshot for every new subscriber; ORCH-1 sync-dispose joins the pump.
Management/UI: MG-2 site scope on audit tree + Flow Debugger Replay; MG-3 stale-probe memo
removed; MG-4 server-owned bulk-deploy deadline; UI-5 sandbox runs in a killable child
process (new CentralUI.SandboxWorker project); UI-14 bounded sandbox output/IPC.
Edge/audit: EI-1 relay audit ownership; EI-2 SkipBodyCapture suppresses error text; EI-3/EI-11
error-field redaction + caps; EI-4 single relay deadline, pre-execution-only retry; EI-5
authenticated relay provenance; EI-10 body cap before audit read.
Persistence/contracts: DL-1 global Instance.UniqueName unique index + conflict translation;
DL-2 DataConnection protocol config encrypted at rest (migration
20260909203046_EnforceGlobalInstanceNamesAndProtectProtocolConfiguration — coordinated
central upgrade, old binaries cannot read protected rows); DL-3 bounded Replay paging;
DL-6 cross-site Overwrite of a deployed instance rejected; XC-4 proto descriptor contract test.
Config/hygiene: XC-1 central listener isolation by local port; XC-2/XC-3 inert SMTP + cron
keys removed from rig settings; CM-2 env2 bootstrap guard enabled; DC-6 deploy site exit code;
DC-7 notifier retries only explicit standby rejection; XC-5 ClusterClient purged from docs.
Gates recorded in the report: build 0/0, 9 397 passed / 0 failed, rig redeployed on all
eight nodes with the migration applied. 46 Low findings remain open.
This commit is contained in:
@@ -180,8 +180,7 @@ to re-enable", and the single-instance deploy remains the explicit re-enable pat
|
||||
**Reconciliation is bounded per batch.** Phase 1 is serial, so an unreachable site
|
||||
would otherwise cost the batch one full communication-layer `QueryTimeout` (30 s)
|
||||
per instance before a single deploy was sent — hours for a large site, past the
|
||||
CLI's 5-minute bulk deadline, which cancels and re-arms the identical cost on the
|
||||
next attempt. Each reconcile in a bulk deploy therefore runs under the short
|
||||
server's bulk scheduling deadline. Repeated client timeouts must not re-arm the identical cost on another attempt. Each reconcile in a bulk deploy therefore runs under the short
|
||||
`SiteDeploymentReconcileTimeout` (default **5 s**), and the FIRST one to hit that
|
||||
deadline opens a once-per-batch circuit-breaker that skips the remaining
|
||||
reconciles (one summary log line, not N). Skipping costs nothing: a timed-out
|
||||
@@ -319,3 +318,9 @@ The Deployment Manager sends the following commands to sites via the Communicati
|
||||
- **Site Runtime**: Receives and applies configurations and lifecycle commands.
|
||||
- **Health Monitoring**: Deployment failures contribute to site health status.
|
||||
- **Transport (#24)**: Does not invoke Deployment Manager directly. Transport-driven template changes propagate to deployed instances through the existing revision-hash drift detection in `DeploymentService.CompareAsync`; the Deployments page surfaces affected instances as stale automatically.
|
||||
|
||||
### Authoritative staleness and bulk deadlines
|
||||
|
||||
`StaleInstanceProbe` no longer memoizes revision hashes against process-local watermarks. Every probe starts a fresh flatten session, so a configuration edit through another central is visible to the next deployment skip decision. This trades extra flattening work for correctness across shared-database writers.
|
||||
|
||||
Management bulk deployment uses `LongRunningCommandTimeout` as an overall scheduling/send deadline. Cancellation stops scheduling more instances, fails unfinished eligible rows, and releases prepared operation locks. Completed and deliberately skipped outcomes remain in the response. HTTP Ask reserves an additional60 seconds for cleanup and response; the bulk CLI defers its timeout to this server-owned deadline.
|
||||
|
||||
Reference in New Issue