Mark corrections-doc E2 (Aveva System Platform IO pattern verification) as RESOLVED with GREEN-YELLOW verdict — the OtOpcUa team completed the research, published findings at lmxopcua/docs/v2/aveva-system-platform-io-research.md, and added a Phase 1 acceptance test (Task E.10, decision
#142
) to catch AppServer-specific quirks well before the Year 3 tier-3 cutover schedule. AVEVA's OI Gateway is the documented path; multiple non-AVEVA upstream-server integrations exist in published partner walkthroughs; no re-architecting of OtOpcUa needed. Two integrator-burden risks the plan team should track: validation/GxP paperwork (no AVEVA Part 11 blueprint for non-AVEVA upstream servers — engage QA/regulatory in Year 1) and unpublished scale benchmarks (in-house benchmark required in Year 2 before tier-3 cutover scheduling).
...
Co-Authored-By: Claude Opus 4.7 (1M context) <
noreply@anthropic.com
>
2026-04-17 13:27:28 -04:00
..
otopcua-corrections-2026-04-17.md
Mark corrections-doc E2 (Aveva System Platform IO pattern verification) as RESOLVED with GREEN-YELLOW verdict — the OtOpcUa team completed the research, published findings at lmxopcua/docs/v2/aveva-system-platform-io-research.md, and added a Phase 1 acceptance test (Task E.10, decision
#142
) to catch AppServer-specific quirks well before the Year 3 tier-3 cutover schedule. AVEVA's OI Gateway is the documented path; multiple non-AVEVA upstream-server integrations exist in published partner walkthroughs; no re-architecting of OtOpcUa needed. Two integrator-burden risks the plan team should track: validation/GxP paperwork (no AVEVA Part 11 blueprint for non-AVEVA upstream servers — engage QA/regulatory in Year 1) and unpublished scale benchmarks (in-house benchmark required in Year 2 before tier-3 cutover scheduling).
2026-04-17 13:27:28 -04:00
otopcua-handoff.md
Add OtOpcUa implementation handoff document
2026-04-17 09:21:25 -04:00