Commit Graph

2 Commits

Author SHA1 Message Date
Joseph Doherty
ebc76e9315 Seed UNS hierarchy across 6 sites; rebrand outputs to SCADA IT/OT with ZB template
Lands per-site UNS subtree files (Warsaw West/North, Shannon, Galway, TMT,
Ponce) seeded from OpenText facility docs — Warsaw split confirmed as
numbered = legacy Zimmer = West, lettered = legacy Biomet = North. Renames
project framing from "Shopfloor IT/OT" to "SCADA IT/OT" for accuracy.
Extracts a ZB-branded PowerPoint template from example_powerpoint.pptx and
wires it into the outputs pipeline. Trims deck from 18 to 16 slides
(BOBJ->Power BI transferred to another team, Non-Goals and Asks dropped);
goal-state BOBJ analysis pruned to a stub.
2026-04-30 10:54:49 -04:00
Joseph Doherty
658de96849 Generate first PPTX: 18-slide mixed-stakeholder deck
First run of the regeneration pipeline. 18 slides per presentation-spec.md:
title, exec summary, today's reality, vision, three pillars, enterprise
layout, systems, layered architecture (colored boxes), end-to-end data flow,
OtOpcUa, analytics stack, Redpanda EventHub, 3-year roadmap (table),
Year 1 focus, legacy retirement, open coordination items, non-goals,
asks & next steps.

Design: dark navy (#1B2838) for title/vision/closing slides, white for
content, blue (#2980B9) headers, orange (#E67E22) accents.
2026-04-17 13:49:55 -04:00